Size limit
1,200 W
Section 9 of the act. Quote checked against the Public Act PDF on November 21, 2026.
“has a maximum power output of not more than one thousand two hundred watts”
Source: cga.ct.gov, checked November 21, 2026
Where it stands
In force since October 1, 2026.
“Effective October 1, 2026”
Bill
H.B. 5340, An Act Concerning Renewable Power Generation (Public Act 26-127)
Source: cga.ct.gov, checked November 21, 2026
1,200 W
Section 9 of the act. Quote checked against the Public Act PDF on November 21, 2026.
“has a maximum power output of not more than one thousand two hundred watts”
Source: cga.ct.gov, checked November 21, 2026
No approval by the electric distribution company, no interconnection agreement, no fee beyond usage charges, no extra equipment; one device behind a meter
Section 9 of the act. Quote checked against the Public Act PDF on November 21, 2026.
“obtain the company's approval before installing or using the system”
Source: cga.ct.gov, checked November 21, 2026
The statute we read says nothing on this.
Section 9 does not address renters, landlords or associations, and the words landlord and tenant do not occur in the act. Read in the Public Act PDF on November 21, 2026.
Landlords and associations, state by state
Source: cga.ct.gov, checked November 21, 2026
No compensation; excess generation is charged to the customer as usage unless the meter allows for net metering
Section 9 of the act. Quote checked against the Public Act PDF on November 21, 2026.
“will result in such excess generation being charged to the customer as usage”
What unpaid power does to a kit’s savings
Source: cga.ct.gov, checked November 21, 2026
The statute we read says nothing on this.
Source: cga.ct.gov, checked November 21, 2026
Certified by UL or an equivalent nationally recognized testing laboratory; UL Standard 1741; National Electrical Code and IEEE 1547
Section 9 of the act, which also requires the National Electric Code (NFPA 70), IEEE 1547 and UL Standard Number 1741. Quote checked against the Public Act PDF on November 21, 2026.
“certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory”
What the certifications mean, law by law
Source: cga.ct.gov, checked November 21, 2026
The electric distribution company is not liable; the State Building Code still applies; the device must not energize the building during an outage
Section 9 of the act. Quote checked against the Public Act PDF on November 21, 2026.
“be liable for any damage or injury caused by a portable solar generation device”
Source: cga.ct.gov, checked November 21, 2026
The size limit
Each kit’s inverter AC output is compared with Connecticut’s limit of 1,200 W, the kit on its own. This checks size only. The law has other rules too, such as certification.
“has a maximum power output of not more than one thousand two hundred watts”
Within the size limit
360 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceWithin the size limit
360 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceWithin the size limit
800 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceWithin the size limit
800 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceWithin the size limit
900 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceWithin the size limit
900 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceWithin the size limit
1,120 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceWithin the size limit
1,200 W of AC output is within Connecticut’s limit of 1,200 W.
Its values and priceNo size check
Its AC output is not verified, so we cannot compare it with the limit.
Its values and priceIn order of inverter output, smallest first. We have not tested these kits. The calculator gives its output, savings and payback for your address.
General information, not legal advice. Your lease, your HOA and your utility can add rules of their own. Where a field says “not yet verified from the statute”, we have not filled it in from any other source.