UL 1741
The standard for the equipment that connects a power source, such as a solar panel, to the grid. UL Solutions tests inverters to it, and to grid codes:
“local grid codes such as IEEE 1547”
Every plug-in solar law we have read asks for a certified kit. Here is what the two standards they name are, in the words of the company that certifies to them, and what each law asks for.
The short answer
UL 3700 is written for plug-in solar systems. UL 1741 covers inverters and other grid equipment.
Maine, Vermont and New Jersey name UL 3700, each with a comparable standard as an alternative. Connecticut’s act, as our record has it, names UL 1741. The other laws ask for certification by UL or another nationally recognized testing laboratory.
Standards described from UL Solutions’ own pages, read on November 21, 2026. Laws from the state record, read on November 20, 2026.
UL 3700
“The new program is an evaluation based on UL 3700, the Outline of Investigation for Interactive Plug-In Photovoltaic Equipment and Systems”
UL Solutions, news release of January 8, 2026
UL 1741
“UL 1741, the Standard for Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources”
UL Solutions, distributed energy resource testing
UL Solutions announced a testing and certification program for plug-in solar on January 8, 2026, based on UL 3700. It describes the outline like this:
“It defines construction, performance and labeling criteria tailored to plug-in solar systems, also referred to as balcony solar”
On what UL 3700 requires:
“UL 3700 addresses these additional risks by requiring features that mitigate accidental contact with hazardous electric parts, promote safe installation, protect against overloads and prevent electric current from flowing in the wrong direction.”
UL 3700 is an “Outline of Investigation”. We could not read its text or its edition: the store page we tried refused our request.
A plug-in kit sends power into an outlet, the opposite of what an outlet circuit is built for. UL Solutions describes the risk like this:
“Branch circuits are designed for one-way power flow—from the panelboard to the load. When a PIPV system backfeeds power into the same circuit, the combined current from the utility and PIPV source can exceed conductor ratings without tripping the circuit breaker.”
And on the ground-fault outlets used outdoors and in wet places:
“PIPV systems can compromise GFCI protection, a critical safety feature in outdoor and wet locations.”
We do not give safety advice of our own. Before you plug in a kit, ask your utility what it requires, and have a licensed electrician look at the circuit you plan to use.
The standard for the equipment that connects a power source, such as a solar panel, to the grid. UL Solutions tests inverters to it, and to grid codes:
“local grid codes such as IEEE 1547”
Most laws accept UL “or an equivalent” laboratory. Federal rules define the term:
“The term nationally recognized testing laboratory (NRTL) means an organization which is recognized by OSHA in accordance with appendix A of this section and which tests for safety, and lists or labels or accepts, equipment or materials”
“The NRTL is completely independent of employers subject to the tested equipment requirements, and of any manufacturers or vendors of equipment or materials being tested for these purposes”
Several laws also ask for the most recent National Electrical Code (NFPA 70). We could not read the code itself. On the website of NFPA, which publishes the code, we found proposed amendments for plug-in systems. A manufacturer filed them, with comments closing on November 20, 2026. One proposes this definition:
“Plug-in Photovoltaic (PIPV) System. A photovoltaic power production system connected to a premises wiring system by means of a cord and plug connection to a receptacle outlet, capable of supplying power to premises loads, exporting power to the electric utility system, or both.”
A proposal is not part of the code. We have not found a decision on them.
Listed or certified to UL 3700 or other applicable UL or electrical-code standards, or a comparable standard of a nationally recognized testing laboratory, or set up as the adopted National Electrical Code requires.
“Listed or certified in accordance with UL 3700, the Outline of Investigation for Interactive Plug-in Photovoltaic Equipment and Systems”
Complies with UL 3700, or an equivalent certification, and operates to IEEE 1547-2018.
“complies with UL 3700 for plug-in photovoltaic systems by UL Solutions or an equivalent certification”
Listed or certified to UL 3700 or a comparable standard by a nationally recognized testing laboratory. Kits of 400 W or less are exempt from listing and code provisions that would require changes to the building.
“in accordance with Underwriters Laboratories Standard No. 3700 ... or a comparable standard”
Meets the National Electrical Code (NFPA 70) and IEEE 1547, is certified by UL or an equivalent nationally recognized testing laboratory, and meets UL Standard 1741.
“certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory”
Certified as a plug-in photovoltaic system by UL or an equivalent nationally recognized testing laboratory, with a certified feature that isolates the kit from the building’s electrical system.
“Is certified as a plug-in photovoltaic system by Underwriters Laboratories, or an equivalent nationally recognized testing laboratory.”
Certified by UL or an equivalent nationally recognized testing laboratory, and meeting the most recent National Electrical Code.
“is certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory”
Certified by UL or an equivalent nationally recognized testing laboratory. Kits of 391 W or less are exempt from listing provisions that would require changes to the building.
“CERTIFIED BY UNDERWRITERS LABORATORY OR AN EQUIVALENT NATIONALLY RECOGNIZED TESTING LABORATORY”
Certified by a nationally recognized testing laboratory as federal rules define it, and meeting the most recent National Electrical Code. Kits of 391 W or less are exempt from listing provisions that would require changes to the building. Takes effect January 1, 2027.
“is certified by a nationally recognized testing laboratory, as described in 29 C.F.R. § 1910.7”
Labeled and listed by a nationally recognized testing laboratory. From January 1, 2027, a device over 391 W may not be sold, leased or rented unless it is labeled and listed by UL.
“Is LABELED AND LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY.”
Passed, not signed. The bill asks for a kit listed or certified by an accredited nationally recognized testing laboratory as a complete plug-in photovoltaic system.
“IS LISTED OR CERTIFIED BY AN ACCREDITED NATIONALLY RECOGNIZED TESTING LABORATORY AS A COMPLETE PLUG-IN PHOTOVOLTAIC SYSTEM”
Pending. The House version asks for UL or an equivalent laboratory and the most recent National Electrical Code.
“is certified by Underwriters Laboratories, Inc. or an equivalent nationally recognized testing laboratory.”
Not yet verified from the statute: New Hampshire and the District of Columbia.
The state pages list the rest of each law: the size limit and the notice to your utility. Whether a kit pays for itself on your balcony: the calculator.
Predrag Bogićević is responsible for this page and checks it against these sources before it is published. Write to us through the legal notice if something is wrong.
General information, not legal advice. Your lease, your association and your utility can add rules of their own.